1981 plant

1981:

First solid fired hot gas generator with refractory free furnace.

Turn key plant supplied by Cornel. Schmidt GmbH & Co KG (Managing Director Dipl. Ing. Michael Kaden) Plant operator: Glunz AG, Triangel.

Fuel used: Solid waste / sander dust / HFO.
Thermal capacity = 18 MW.
Hot gas = 15 MW.
Steam = 10 MW.








software on computer

1997:

Retrofit of two dryers with PLC control turn key retrofit Thermax cc South Africa.

Plant operator: PGBison Stellenbosch, South Africa.

Increase of plant capacity, after retrofit, through higher plant availability = 20 %.











1997 plant

1997:

Retrofit of a single dryer cyclone with 4 CyDesign high efficiency cyclones for an existing jet dryer.

Turn key retrofit.

Plant operator: PGBison Stellenbosch, South Africa.

Particulate emission after retrofit < 50 mg/Nm3.










2001 plant

2001:

logo

Turn key installation of a hot gas generator with fluidised bed firing.

Client: Algoa Brick (Pty) Ltd Port Elizabeth, South Africa.

Fuel used: Mixture from sewage sludge, wood shavings and bituminous coal.








2006 plant

2006:

logo

Turn key hot gas plant with thermal oil heating.


Plant operator : Egger UK Ltd. / Egger Rol France.


Fuel used : grate firing / dust burning / oil & gas
Thermal capacity: 50MW
Hot gas: 36MW
Thermal oil: 12 MW